Room & contents
The room plan and intended contents shape the full wall elevation, adjacent furniture and coordinated finish references.
Wine storage / built in wine cabinet
Wine display as part of the wider room composition.
This built in wine cabinet direction coordinates a long bottle-and-glass storage wall with the room layout. The cabinetry, serving zone and wall junctions are developed together around site dimensions.
← Back to Wine Storage Cabinets01 / Specification & customisation
A clear schedule connects the room, storage arrangement and supplied components.
| Cabinet arrangement | Long cabinet wall with a central serving zone |
|---|---|
| Storage coordination | Wine, glassware and general dining storage |
| Overall dimensions | By the approved project drawing |
| Cabinet construction | By the agreed material schedule |
| Fronts and finish | Agreed surface and appearance sample |
| Opening and fittings | Brand, model and access by quotation |
| Supply package | Cabinetry and other items listed separately |
Final dimensions, construction and supplied items follow the agreed quotation, samples and drawings.
The room plan and intended contents shape the full wall elevation, adjacent furniture and coordinated finish references.
The material schedule, front assembly and surface sample establish the cabinet specification.
Door movement, drawer travel and reachable storage are coordinated in the drawings.
Equipment, electrical work, fixing and local installation are separately identified in the scope.
02 / Design details
The visible arrangement starts the discussion; the drawings establish how it works.
01
The dining table, circulation, windows and wall services shape the cabinet brief. A full elevation helps keep the wine section proportionate to the wider storage wall.
02
Wine bottles, stemware and tableware call for different compartments. Identify their zones before agreeing shelf spacing, drawer divisions and the balance of open and closed fronts.
03
Separate cabinet sections should share a clear finish and hardware schedule. Samples and drawing references help maintain the intended relationship between the serving zone and adjacent furniture.

Storage coordination
The cabinet interior, front arrangement and surrounding elements are developed together around the agreed project drawing.

Finish & construction
Colour, sheen, edge treatment and the cabinet construction belong in the same finish brief. Record the approved sample alongside the drawing revision.

Hardware & access
The selected pulls, hinges, rails and runners affect access and the visible front. Brands, models and positions should be identified in the quotation.
03 / Order process
Foshan Bridge coordinates the sourcing discussion, item schedule and agreed order follow-up.

STEP 1
Send the room plan and the intended the full wall elevation, adjacent furniture and coordinated finish references.

STEP 2
Review construction, finishes, fittings and the separately listed supply items.

STEP 3
Coordinate the full wall elevation, adjacent furniture and coordinated finish references within the agreed cabinet dimensions.

STEP 4
Agree the finish sample, drawing revision, supply scope and pro forma invoice.

STEP 5
Follow the agreed milestones, component labels and protective packing requirements.

STEP 6
Review the packing list, handling arrangements and agreed shipment responsibilities.
Order coordination
See how drawings, samples, order documents and shipment checks connect during a cabinet procurement project.
Watch on YouTube ↗04 / Before you enquire
Start with the details that affect the cabinet, its contents and the project scope.
Discuss the wine section alongside the other required cabinetry and furniture. Individual items, finish references and delivery responsibilities should remain clear in the proposal.
A room plan and full wall elevation are useful. Include the table position, finished wall dimensions, services and the main storage groups.
A room plan, intended contents, approximate quantities, appearance references and delivery destination help define the brief. Equipment models are useful where relevant.
The accepted quotation identifies construction, finishes, fittings and the supplied items. Samples and approved drawings establish the agreed specification; site work and delivery responsibilities are listed separately.
06 / Your project
Share a room plan, required quantities and destination with Foshan Bridge. We can discuss the cabinet arrangement, samples and sourcing scope around your project.