Room & contents
The room plan and intended contents shape glazed-door openings, stemware clearance and shelf positions.
Wine storage / wine cabinet with glass doors
A clear view of the collection behind a glazed front.
A wine cabinet with glass doors keeps bottles and hanging stemware visible behind glazed fronts. Coordinate the door assembly, shelf clearances and opening access within the agreed cabinet layout.
← Back to Wine Storage Cabinets01 / Specification & customisation
A clear schedule connects the room, storage arrangement and supplied components.
| Cabinet arrangement | Glazed display with bottle and glass zones |
|---|---|
| Storage coordination | Bottle lengths, glass heights and door clearance |
| Overall dimensions | By the approved project drawing |
| Cabinet construction | By the agreed material schedule |
| Fronts and finish | Agreed surface and appearance sample |
| Opening and fittings | Brand, model and access by quotation |
| Supply package | Cabinetry and other items listed separately |
Final dimensions, construction and supplied items follow the agreed quotation, samples and drawings.
The room plan and intended contents shape glazed-door openings, stemware clearance and shelf positions.
The material schedule, front assembly and surface sample establish the cabinet specification.
Door movement, drawer travel and reachable storage are coordinated in the drawings.
Equipment, electrical work, fixing and local installation are separately identified in the scope.
02 / Design details
The visible arrangement starts the discussion; the drawings establish how it works.
01
The glass specification, frame assembly and opening fittings belong in the same cabinet brief. Door travel needs space beside adjacent furniture and the serving area.
02
Stemware shape and height affect both the hanging rails and the shelf below. The useful clearance should account for lifting a glass in and out, not only its resting position.
03
Optional display lighting needs an agreed location for drivers, wiring and controls. Access for replacement should remain available after the cabinet fronts are installed.

Storage coordination
The cabinet interior, front arrangement and surrounding elements are developed together around the agreed project drawing.

Finish & construction
Colour, sheen, edge treatment and the cabinet construction belong in the same finish brief. Record the approved sample alongside the drawing revision.

Hardware & access
The selected pulls, hinges, rails and runners affect access and the visible front. Brands, models and positions should be identified in the quotation.
03 / Order process
Foshan Bridge coordinates the sourcing discussion, item schedule and agreed order follow-up.

STEP 1
Send the room plan and the intended glazed-door openings, stemware clearance and shelf positions.

STEP 2
Review construction, finishes, fittings and the separately listed supply items.

STEP 3
Coordinate glazed-door openings, stemware clearance and shelf positions within the agreed cabinet dimensions.

STEP 4
Agree the finish sample, drawing revision, supply scope and pro forma invoice.

STEP 5
Follow the agreed milestones, component labels and protective packing requirements.

STEP 6
Review the packing list, handling arrangements and agreed shipment responsibilities.
Order coordination
See how drawings, samples, order documents and shipment checks connect during a cabinet procurement project.
Watch on YouTube ↗04 / Before you enquire
Start with the details that affect the cabinet, its contents and the project scope.
Glass fronts provide an enclosure; they do not establish refrigeration or humidity control. Any cooling system must be separately specified and coordinated.
Lighting is included only when identified in the accepted scope. The proposal should list fittings, controls, power requirements and installation responsibilities.
A room plan, intended contents, approximate quantities, appearance references and delivery destination help define the brief. Equipment models are useful where relevant.
The accepted quotation identifies construction, finishes, fittings and the supplied items. Samples and approved drawings establish the agreed specification; site work and delivery responsibilities are listed separately.
06 / Your project
Share a room plan, required quantities and destination with Foshan Bridge. We can discuss the cabinet arrangement, samples and sourcing scope around your project.