Room & contents
The room plan and intended contents shape the narrow wall position, bottle openings and lower door movement.
Wine storage / narrow wine cabinet
Use a slim wall position for organised bottle and accessory storage.
This narrow wine cabinet direction places divided bottle compartments, display shelves and lower storage within a vertical wall opening. Its taller composition uses a different footprint from a compact serving cabinet.
← Back to Wine Storage Cabinets01 / Specification & customisation
A clear schedule connects the room, storage arrangement and supplied components.
| Cabinet arrangement | Vertical display with a central bottle grid |
|---|---|
| Storage coordination | Bottle diameter and length, shelf contents and door access |
| Overall dimensions | By the approved project drawing |
| Cabinet construction | By the agreed material schedule |
| Fronts and finish | Agreed surface and appearance sample |
| Opening and fittings | Brand, model and access by quotation |
| Supply package | Cabinetry and other items listed separately |
Final dimensions, construction and supplied items follow the agreed quotation, samples and drawings.
The room plan and intended contents shape the narrow wall position, bottle openings and lower door movement.
The material schedule, front assembly and surface sample establish the cabinet specification.
Door movement, drawer travel and reachable storage are coordinated in the drawings.
Equipment, electrical work, fixing and local installation are separately identified in the scope.
02 / Design details
The visible arrangement starts the discussion; the drawings establish how it works.
01
Side panels, finishes and door assemblies reduce the clear internal space. Record the bottle profiles alongside the finished wall opening before agreeing the shelf and grid positions.
02
A central grid can organise bottles while adjacent shelves carry accessories. The drawing should show how bottles are placed and removed without interference from nearby shelves or fronts.
03
Keep frequently used items within practical reach and assign the upper display a clear purpose. Lower doors, handles and the surrounding skirting need coordinated opening clearances.

Storage coordination
The cabinet interior, front arrangement and surrounding elements are developed together around the agreed project drawing.

Finish & construction
Colour, sheen, edge treatment and the cabinet construction belong in the same finish brief. Record the approved sample alongside the drawing revision.

Hardware & access
The selected pulls, hinges, rails and runners affect access and the visible front. Brands, models and positions should be identified in the quotation.
03 / Order process
Foshan Bridge coordinates the sourcing discussion, item schedule and agreed order follow-up.

STEP 1
Send the room plan and the intended the narrow wall position, bottle openings and lower door movement.

STEP 2
Review construction, finishes, fittings and the separately listed supply items.

STEP 3
Coordinate the narrow wall position, bottle openings and lower door movement within the agreed cabinet dimensions.

STEP 4
Agree the finish sample, drawing revision, supply scope and pro forma invoice.

STEP 5
Follow the agreed milestones, component labels and protective packing requirements.

STEP 6
Review the packing list, handling arrangements and agreed shipment responsibilities.
Order coordination
See how drawings, samples, order documents and shipment checks connect during a cabinet procurement project.
Watch on YouTube ↗04 / Before you enquire
Start with the details that affect the cabinet, its contents and the project scope.
Narrow describes the width available at the wall; small describes the overall scale. This direction uses a taller elevation, with storage arranged around a restricted width.
Provide the actual bottle profiles. Compartment clearances, depth and usable positions are established in the approved layout rather than assumed from the picture.
A room plan, intended contents, approximate quantities, appearance references and delivery destination help define the brief. Equipment models are useful where relevant.
The accepted quotation identifies construction, finishes, fittings and the supplied items. Samples and approved drawings establish the agreed specification; site work and delivery responsibilities are listed separately.
06 / Your project
Share a room plan, required quantities and destination with Foshan Bridge. We can discuss the cabinet arrangement, samples and sourcing scope around your project.