Room & contents
The room plan and intended contents shape shelf spacing, daily access and the side-front clearance.
Wine storage / wine display cabinet
Accessible shelves for bottles and serving pieces.
This wine display cabinet brings selected bottles, glasses and serving pieces onto visible shelves. Shelf spacing, the backing surface and the surrounding fronts are coordinated around the project display brief.
← Back to Wine Storage Cabinets01 / Specification & customisation
A clear schedule connects the room, storage arrangement and supplied components.
| Cabinet arrangement | Open shelves within a tall cabinet opening |
|---|---|
| Storage coordination | Display pieces, shelf spacing and reachable depth |
| Overall dimensions | By the approved project drawing |
| Cabinet construction | By the agreed material schedule |
| Fronts and finish | Agreed surface and appearance sample |
| Opening and fittings | Brand, model and access by quotation |
| Supply package | Cabinetry and other items listed separately |
Final dimensions, construction and supplied items follow the agreed quotation, samples and drawings.
The room plan and intended contents shape shelf spacing, daily access and the side-front clearance.
The material schedule, front assembly and surface sample establish the cabinet specification.
Door movement, drawer travel and reachable storage are coordinated in the drawings.
Equipment, electrical work, fixing and local installation are separately identified in the scope.
02 / Design details
The visible arrangement starts the discussion; the drawings establish how it works.
01
Tall bottles, decanters and serving pieces rarely share one height. Shelf spacing should reflect those groups so the composition stays useful as well as visually balanced.
02
Side fronts and nearby furniture affect the space available to reach the display. Plan the movement of any folding or hinged panels against the room layout.
03
Open shelving exposes more surfaces to routine cleaning. Shelf depth, lighting positions and the space around display pieces should leave practical access.

Storage coordination
The cabinet interior, front arrangement and surrounding elements are developed together around the agreed project drawing.

Finish & construction
Colour, sheen, edge treatment and the cabinet construction belong in the same finish brief. Record the approved sample alongside the drawing revision.

Hardware & access
The selected pulls, hinges, rails and runners affect access and the visible front. Brands, models and positions should be identified in the quotation.
03 / Order process
Foshan Bridge coordinates the sourcing discussion, item schedule and agreed order follow-up.

STEP 1
Send the room plan and the intended shelf spacing, daily access and the side-front clearance.

STEP 2
Review construction, finishes, fittings and the separately listed supply items.

STEP 3
Coordinate shelf spacing, daily access and the side-front clearance within the agreed cabinet dimensions.

STEP 4
Agree the finish sample, drawing revision, supply scope and pro forma invoice.

STEP 5
Follow the agreed milestones, component labels and protective packing requirements.

STEP 6
Review the packing list, handling arrangements and agreed shipment responsibilities.
Order coordination
See how drawings, samples, order documents and shipment checks connect during a cabinet procurement project.
Watch on YouTube ↗04 / Before you enquire
Start with the details that affect the cabinet, its contents and the project scope.
A mixed open-and-closed arrangement can be discussed in the project drawings. Front construction, fittings and opening space need to be reviewed with the revised layout.
A short contents list with the tallest pieces and their dimensions is useful. Separate everyday items from occasional display pieces when setting shelf positions.
A room plan, intended contents, approximate quantities, appearance references and delivery destination help define the brief. Equipment models are useful where relevant.
The accepted quotation identifies construction, finishes, fittings and the supplied items. Samples and approved drawings establish the agreed specification; site work and delivery responsibilities are listed separately.
06 / Your project
Share a room plan, required quantities and destination with Foshan Bridge. We can discuss the cabinet arrangement, samples and sourcing scope around your project.