Room & contents
The room plan and intended contents shape room height, accessible shelves and site fixing requirements.
Wine storage / tall wine cabinet
A full-height composition with a defined daily-use zone.
This tall wine cabinet combines open bottle display, upper shelving and lower storage in one vertical elevation. Develop reachable storage and any access equipment alongside the finished room height.
← Back to Wine Storage Cabinets01 / Specification & customisation
A clear schedule connects the room, storage arrangement and supplied components.
| Cabinet arrangement | Tall display above enclosed lower fronts |
|---|---|
| Storage coordination | Reachable shelves and upper display contents |
| Overall dimensions | By the approved project drawing |
| Cabinet construction | By the agreed material schedule |
| Fronts and finish | Agreed surface and appearance sample |
| Opening and fittings | Brand, model and access by quotation |
| Supply package | Cabinetry and other items listed separately |
Final dimensions, construction and supplied items follow the agreed quotation, samples and drawings.
The room plan and intended contents shape room height, accessible shelves and site fixing requirements.
The material schedule, front assembly and surface sample establish the cabinet specification.
Door movement, drawer travel and reachable storage are coordinated in the drawings.
Equipment, electrical work, fixing and local installation are separately identified in the scope.
02 / Design details
The visible arrangement starts the discussion; the drawings establish how it works.
01
The most frequently used bottles and glasses belong within an agreed reachable zone. Upper shelves need a deliberate purpose rather than simply extending the storage grid.
02
Cabinet height, loading and the site substrate influence the fixing brief. Any ladder or access equipment shown in a reference must be separately assessed and listed.
03
Tall components may need to pass through lifts, doors and corridors. Component sizes, joint locations and site assembly responsibilities should be resolved before production.

Storage coordination
The cabinet interior, front arrangement and surrounding elements are developed together around the agreed project drawing.

Finish & construction
Colour, sheen, edge treatment and the cabinet construction belong in the same finish brief. Record the approved sample alongside the drawing revision.

Hardware & access
The selected pulls, hinges, rails and runners affect access and the visible front. Brands, models and positions should be identified in the quotation.
03 / Order process
Foshan Bridge coordinates the sourcing discussion, item schedule and agreed order follow-up.

STEP 1
Send the room plan and the intended room height, accessible shelves and site fixing requirements.

STEP 2
Review construction, finishes, fittings and the separately listed supply items.

STEP 3
Coordinate room height, accessible shelves and site fixing requirements within the agreed cabinet dimensions.

STEP 4
Agree the finish sample, drawing revision, supply scope and pro forma invoice.

STEP 5
Follow the agreed milestones, component labels and protective packing requirements.

STEP 6
Review the packing list, handling arrangements and agreed shipment responsibilities.
Order coordination
See how drawings, samples, order documents and shipment checks connect during a cabinet procurement project.
Watch on YouTube ↗04 / Before you enquire
Start with the details that affect the cabinet, its contents and the project scope.
Any ladder or access equipment must be expressly listed in the quotation. Its support, use and site suitability require a separate project review.
Finished room height, wall substrate, ceiling restrictions and the delivery route are useful starting points. Include the intended contents when discussing fixing and assembly.
A room plan, intended contents, approximate quantities, appearance references and delivery destination help define the brief. Equipment models are useful where relevant.
The accepted quotation identifies construction, finishes, fittings and the supplied items. Samples and approved drawings establish the agreed specification; site work and delivery responsibilities are listed separately.
06 / Your project
Share a room plan, required quantities and destination with Foshan Bridge. We can discuss the cabinet arrangement, samples and sourcing scope around your project.