1. Establish the reference before the check
Identify the order, product code, quantity and version being checked. Use the applicable accepted quotation, drawing and sample references. If these disagree, resolve the reference before asking whether the item conforms to it.
Separate an inspection request from a general progress update. State the question you need answered and the record that will help. This preparation sheet does not establish an automatic inspection scope for every order or promise that every unit will receive the same checks.
2. Agree what will be checked and recorded
Discuss the products, quantities and relevant details within the proposed scope. Record whether the question concerns visible appearance, a dimension, the configuration, package identification or another requirement. Agree who performs the check and which records will be provided.
Foshan Bridge can provide relevant photographs; inspection report arrangements are agreed with the customer. A customer-appointed third-party inspection is a paid arrangement. Keep any specialist method, provider and report scope explicit rather than assuming they are included in a general photo record.
3. Connect the question to a useful record
| Question | Reference and record to prepare |
|---|---|
| Is this the selected finish? | Sample code, applicable part and a relevant photograph |
| Does this detail match the drawing? | Drawing reference/revision and the agreed dimensional record |
| Which item has an issue? | Item code, quantity and a clear detail image or record |
| Is the configuration complete? | Item schedule and the included components |
| Can the receiving team identify it? | Package mark linked to the room or item |
A photograph helps explain a visible detail. It does not establish every dimension or substitute for a safety, emissions or other specialist test. Choose the record to suit the question and use the appropriate method where a measurement or assessment is required.
4. Keep colour and dimensions in context
When reviewing a surface, identify the part, sample and conditions of the comparison. Avoid approving a finish solely from an unlabelled screenshot. If a physical sample is the accepted reference, record that reference alongside the image.
For dimensional questions, identify the feature measured, the units and the drawing revision. An overall furniture size and a specific installation interface answer different questions. Keep site-related measurements with the party responsible for confirming them; use the drawing preparation guide to organise the inputs.
5. Identify packages and outstanding items
Link the product or room code to packing marks, package count and the packing list. Record which accessories or fittings belong to the item so the receiving team can trace them. Keep packed dimensions and weights separate from the product dimensions.
If something is missing or unclear, identify the affected item and the information needed. Do not close the question just because a general shipment photograph exists. The shipping handover guide connects these records to a wider cargo schedule.
6. Use an issue log with a next action
Record the concern, the reference, the photograph or measurement number and the current status. Add the requested action and the decision still required. Agree the applicable handling and approval arrangement rather than inventing a universal pass/fail rule on this page.
The downloadable record is blank and editable. It supports a clearer inspection discussion; it is not a completed inspection certificate, a test report or proof of conformity for an actual product.
BEFORE YOUR NEXT DISCUSSION
Your preparation checklist
0 of 5 ready
Ticks stay in this page only. The download is a blank preparation record, not a completed project document.
Bring the details you already have.
Use the six-step project planner to organise your rooms, products and open questions, or go directly to Contact when you are ready to discuss the scope.
