Doors
Hinged Interior Doors
Single-leaf doors for bedrooms, corridors and other interior openings.
What to check
Confirm handing, wall thickness, finished floor level, leaf finish and lock or latch set.

Foshan Bridge coordinates door and window sourcing and trade supply around your drawings, opening schedule and destination.

One schedule gives everyone the same reference for measuring, comparing quotes and checking what arrives.
Give every door and window an ID, location, quantity and rough opening size.
Record swing, handing and clear space for doors. Note which window panels operate and where screens are needed.
Include wall sections, sill details, finished floor levels and any requirements set by your local project team.
Shortlist opening types and check what to specify for each one.

Doors
Single-leaf doors for bedrooms, corridors and other interior openings.
Confirm handing, wall thickness, finished floor level, leaf finish and lock or latch set.

Doors
Entrance door concepts with an offset pivot and a defined sweep.
Confirm pivot position, clear passage, threshold and the requirements for fixing and weather exposure.

Doors
Glazed panels for wide exterior openings with limited swing space.
Compare panel stacking, threshold detail, screen track and the net opening with all panels parked.

Doors
Multi-panel glazed openings that fold to one or both sides.
Confirm stack direction, head support, traffic leaf, sill drainage and usable clearance.

Windows
Side-hinged sashes for openings where the swing path can be kept clear.
Check hinge side, sash size, opening restrictors, screen position and handle access.

Windows
Horizontally moving sashes for locations with limited swing clearance.
Mark the active sash, track arrangement, drainage and usable opening area.

Windows
Folding glazed panels for a wide opening over a counter or serving area.
Confirm panel stacking, head support, sill drainage and how the opening will be screened or secured.

Windows
Roof glazing for rooms where daylight is needed above the wall openings.
Check roof pitch, waterproofing and flashing details. If the unit opens, confirm access to the operator and maintenance requirements.

Browse published reference materials for your wider building package.
Browse catalogues
Coordinate fitted cabinetry and furnishings against the same project schedule.
Explore procurement
Plan finishes and furnishings alongside the opening schedule.
Explore villa sourcing
Check window placement, sill heights and door clearances against the kitchen plan.
Browse kitchen cabinets
Review circulation and furniture layout around glazed patio openings.
Browse living room furniture
Coordinate terraces and furniture placement with door swings and thresholds.
Browse outdoor furniture

Collect scope, priorities and the information needed for sourcing.
See the project checklistUse the same specification across quotations so you can see what each price covers.
Ask each supplier to quote against the same opening IDs and identify changes to glass, frame, hardware or inclusions.
Check doors against circulation and flooring. Check windows against reveals, screens and maintenance access.
Where performance is required, request documentation that identifies the proposed system and configuration.

Use these checks with your drawings before approving a system or comparing quotations.
Get help turning one opening schedule into comparable supplier enquiries, approvals and order records.

We use your door and window IDs to organise the enquiry and flag gaps that affect quotations.

Compare opening systems, finishes and inclusions against the same project brief.

Where applicable, agree which finishes or hardware samples need review before approval.

Keep opening dimensions, handing and approvals connected to the current drawing revision.

Agree inspection scope, item labels and protection for glass, frames and loose hardware.

Clarify the named destination and the division of packing, transport and installation responsibilities.
Share the details you already have. Mark anything your designer, installer or supplier still needs to confirm.

09 / Order process
Agree the scope and responsibilities for each step in the written order.

Send the schedule, drawing revision and destination. Identify exterior openings and any mandatory project criteria.

Review proposed opening types, frames, glazing, hardware and included items.

Resolve dimensions, handing and finish details with the responsible project team.

Review the written scope, price, timing, terms and agreed checks before placing the order.

Review items against the agreed scope. Match packed frames, glass and hardware to the opening IDs.

Confirm packing lists, shipment scope and the receiving team's installation documents.
Compare the opening details to check for entrances, apartments, terraces and multi-unit interiors.

Review pivot sweep, door handing and the transition from exterior paving to the finished floor.

Tag repeated units by elevation and check sill details, glazing and restrictors for each type.

Check clear opening, panel stacking, drainage and furniture placement around the terrace.

Use room and door codes to track handing, hardware sets, finishes and packing labels.
List an opening ID, quantity, location, rough opening dimensions, opening type and required performance. Attach the current plans or elevations when available.
Yes. Group items by opening type and location in one brief. Quotation scope and supplier arrangements depend on the selected configurations.
The rough opening is the space prepared in the building. Frame size is the outside size of the supplied unit. The installer and supplier should agree clearances, fixing and finish build-up before order approval.
Include the required pane make-up, locks, hinges, handles, screens or restrictors in your brief. Confirm compatibility and what is included in the selected system.
Share the required criteria and destination. We can request documentation for the proposed system. Your responsible project team should check that it applies to the selected sizes, components and installation.
Include the required rating, standard and jurisdiction in the enquiry. Ask for applicable evidence for the complete door set, including frame, hardware and any glazing.
Your local designer or installer should verify site dimensions, substrate, fixing, sealing and drainage. Approve supplier drawings against those conditions before production.
They depend on sizes, quantities, materials, hardware, documentation and shipping scope. Confirm them in the written quotation after the configuration is reviewed.
Discuss protection, labels and unloading with the supplier and receiving team. The agreed packing list should connect each package and its loose hardware to the relevant opening IDs.
Select the opening types you need and add the details you have. Copy the brief to use in the Contact form.