
Casement Windows
Side-hinged sashes for clear openings with internal or external swing space.
What to check
Confirm hinge side, sash weight, restrictors and screen clearance.

Plan window systems around your elevations, ventilation and glazing requirements. Foshan Bridge coordinates supplier enquiries using your window schedule.

Mark each sash and fixed pane on the elevation, then match ventilation and views to the room.
Record opening code, sizes, quantity, position and operating panels.
Specify glazing build-up, profile, finish and any required performance evidence.
Provide sill and reveal sections, fixing substrate, flashing and drainage notes.
Shortlist opening types and check what to specify for each one.

Side-hinged sashes for clear openings with internal or external swing space.
Confirm hinge side, sash weight, restrictors and screen clearance.

Horizontally sliding sashes where a hinged sash would interfere with circulation.
Confirm the track, active panel, usable opening, drainage and cleaning.

A series of glazed panels opening to the side across a wide countertop or opening.
Check stacking side, head support, sill and security.

High-level glazing to bring daylight into rooms with sloped or limited wall openings.
Confirm roof pitch, flashing, waterproofing and maintenance access.

Vertically sliding sashes for openings where outward projection is limited.
Confirm balances, meeting rails, opening clearance and maintenance access.

Glazed assemblies that wrap a room corner and can combine fixed and operable sections.
Confirm the corner support, mullion arrangement and drainage with the designer.

A fixed viewing area combined with opening sashes where ventilation is needed.
Identify exactly which panels move, their access and the continuous seal details.

Two side-hinged sashes sharing one opening where a wider opening is needed.
Confirm meeting stile, active sash and screen or restrictor arrangement.


Browse published reference material for your wider project.
Explore Product Catalogues
Coordinate furnishings and fitted cabinetry in the same project schedule.
Explore Furniture & Cabinetry Sourcing
Bring openings, finishes and furnishings into the same project brief.
Explore Whole Home & Villa Sourcing
Check the kitchen layout against sill levels and opening clearances.
Explore Kitchen Cabinets

Collect your project priorities, quantities and drawings.
Explore Start Your Project
Plan what drawings, finishes and samples to compare during a sourcing visit.
Explore Visit FoshanReview how each option fits your drawings and buying requirements.
Use panel operation and frame dimensions to compare usable openings.
Apply the same pane build-up, coatings and safety requirements across quotes.
Request evidence for the exact window, glazing, hardware and fixing configuration.

Use these options when preparing your opening schedule.
Turn your opening schedule into clear enquiries, approvals and order records.

We organise enquiries by elevation, type, opening code and quantity.

Align profiles, glazing, screens and allowances so differences are clear.

Identify which profile or finish samples need approval.

Connect elevations and section details with the current drawing issue.

Define the check scope and label glazed units and hardware by opening.

Confirm packing, arrival conditions and the receiving team’s documentation.
Share the dimensions, drawings and selection details your team already has.

09 / Order process
Agree the scope and responsibilities for each step in the written order.

Send opening dimensions, elevations, quantities and the destination.

Review profile sections, glazing, screens and hardware against the same schedule.

Resolve sill, frame fixing, drainage and glass details with your project team.

Agree the written scope, price, timings and documentation.

Confirm identification for frames, glazing and hardware before shipment.

Review packing lists, unloading access and the approved drawing set.
Check different opening conditions before preparing the schedule.

Repeat opening codes across units while tracking any glazing or restrictor variation.

Check roof pitch, opening controls and how the window can be reached.

Keep handle reach, counter clearance and ventilation in the selection brief.

Coordinate complete frame assemblies with head, sill and water-management details.
Include opening ID, rough dimensions, quantity, operating panels, frame, glazing, hardware and screens.
Use the operation and ventilation required in each room to compare fixed, casement, sliding, folding or other suitable configurations.
State pane build-up, coatings, safety requirements and any target performance required by your project.
Share the criteria and destination. Request evidence for the proposed profile, glazing, dimensions, hardware and fixing detail.
Include the screen location and style on your schedule. Availability and compatibility depend on the opening system.
Your local team confirms site measurements, fixing and flashing. Review supplier drawings against those conditions before approval.
Unit size, material, glass, hardware, documentation and shipment scope affect quotations and lead times.
Ask for unit and package labels by opening code and confirm unloading, storage and handling with the receiving team.
Select opening types, add your project requirements, then copy the brief to use in the Contact form.