Check the mounting surface
Confirm wall construction, finished floor levels and fixing positions with your installer. Allow for tile thickness and cabinet door swing.
Cabinet drawings and measurementsSource vanities, mirror cabinets and tall storage for residential and multi-unit projects. Compare the options and brief us on what needs to fit.
Choose the cabinets you need around the basin and across the room.
Compare wall-hung and floor-standing layouts with single or double basins.
Plan shallow storage above the basin. Check what the door can clear and where the mirror should sit.
Use vertical space for towels and toiletries. Plan cabinet depth, door swing and access beside the vanity.
Bring these three checks into the room plan and quotation before finalising a cabinet schedule.
Confirm wall construction, finished floor levels and fixing positions with your installer. Allow for tile thickness and cabinet door swing.
Cabinet drawings and measurements
Locate supply points, waste outlets and the trap. Leave access for shut-off valves and check the space behind drawers.
See a pipe-clearance drawer layout
List units by bathroom type. Ask for cabinet finishes, hardware, basins, tops, mirrors, freight and installation to be identified as included or priced separately.
See an installed project and two layouts you can use to brief your own vanity requirements.
Supplier project · Caulfield North, Melbourne, Australia
The supplier scope covered bathroom vanities, kitchen cabinets and wardrobes for an apartment development.
Design reference
Two basins share a long vanity, with separate storage bays for daily use.
View the double-basin vanity
Design reference
A single basin and an open shelf combine countertop space with easy towel access.
View the single-basin vanityPut bathroom quantities and the cabinet schedule into a brief, then agree the drawings, quote and shipping arrangements for your project.
Get a Project Quote
Step 1
Send the bathroom schedule, quantities, room sizes and delivery destination.
Step 2
Check cabinets, fittings, optional accessories and included services by room type.
Step 3
Check basin cut-outs, pipe access, wall fixings and door clearances.
Step 4
Agree the room schedule, finishes, approved drawings and pro forma invoice.
Step 5
Review supplier milestones, protection for mirrored fronts and labels by room type.
Step 6
Confirm packing documents and the agreed delivery arrangements before loading.
Yes. Send your latest drawings and flag any provisional waste or supply locations. Confirm exact positions before approving the cabinetry drawings.
Ask them to confirm the wall construction, support, fixing positions and finished mounting height. Check that plumbing and service access fit the proposed cabinet.
List each cabinet as a separate line with dimensions, finish and quantity. We can review sourcing options and quote the agreed package.
Ask for each item to be listed in the quotation. Confirm the finish, fittings and cut-outs, along with any freight or installation scope.
Describe the expected splash exposure and ventilation. Confirm panel material, edge sealing and installation details for that location with your supplier and installer.
Share your bathroom schedule or the dimensions you have. We can use them to discuss the cabinet package and quotation scope.