Guest rooms
List beds or headboards, bedside pieces, desks, seating and storage relevant to the room design.
HOSPITALITY PROJECTS
Build a hotel purchasing brief around room types, shared spaces and the decisions each item needs. Foshan Bridge supports hotel furniture sourcing, cabinetry and related building-material enquiries, with the product and service scope agreed for the project.

Room types.
A connected purchasing brief.
Room types
Start with a room-type register, then connect each type to its furniture and cabinetry list. Keep the number of rooms separate from the quantity of each item in one room. Record accessible layouts, suites and other variations as distinct requirements where they change the package.
Public areas need their own lines: lobby seating, reception, corridors, dining areas and other requested spaces. A room count alone leaves these quantities and specifications unresolved. Send the current plans and identify who can confirm the quantities.
Scroll across to compare all columns
| Schedule group | Useful input | Decision to resolve |
|---|---|---|
| Guest-room type | Room count, layout and item list | Which items repeat and which vary? |
| Suite / special layout | Its own dimensions and product references | Which differences need a separate review? |
| Public area | Area plan and item quantities | What belongs outside the room package? |
Product package

Use the schedule to connect loose furniture, fitted cabinetry and related requested items. A shared visual direction is useful, while the dimensions, materials and construction of each selected item need their own specification.
List beds or headboards, bedside pieces, desks, seating and storage relevant to the room design.
Separate reception cabinetry, lounge seating and area-specific furniture from the guest-room calculation.
Identify requested vanities and storage, with the actual dimensions and service interfaces to be reviewed.
Requirements
Give the operator’s requirements alongside the product references: intended use, cleaning approach, finish direction, upholstery requirements and any project-specific documentation to be reviewed. Match the evidence requested to the actual material, model and configuration being proposed.
For fitted items, name the party confirming finished site dimensions and service interfaces. Keep design acceptance and dimension approval identifiable in the schedule. The same room image may contain several products with different approval questions.

Approvals
Name the item, reference and decision needed.
Check appearance, dimensions and construction through the appropriate evidence.
Connect accepted references and exceptions to the order documents.
Decide whether the project needs finish samples, individual prototypes or a model-room package. Agree the items, submission format, review questions and cost before that work begins. A selected sample should carry the same item and revision references as the specification it supports.
Drawing services are charged according to the agreed scope. Samples and prototypes are paid; the agreed fee can be credited towards a subsequent order under that order’s conditions. Record the approval, exceptions and any price or timing effect before release.
Handover
Use the same reference in the product schedule.
Agree the identification and available assembly information.
Name who handles the next movement or installation activity.
Discuss proposed batches using the approved room types and public-area list. Supplier readiness, storage, handling and freight arrangements need to support the proposed sequence. A preferred opening date is a planning input until the relevant supply and transport arrangements are agreed.
Agree the item references, room or area labels, package counts and packing-list information the receiving team needs. Identify the available assembly or installation documents and who handles destination clearance, unloading and local installation. Paid installation personnel can be discussed for an agreed location and scope.
Questions
Yes. Mark the current count and its status, then separate the items that can already be reviewed from quantities or configurations still awaiting confirmation. Final pricing and order release require the agreed basis.
A model room is a project-specific scope to discuss. Confirm the products, sample work, review purpose and fees in writing before relying on it.
List their products and quantities separately from the repeated room package. The quotation can then identify the accepted items, configurations and services for each area.
Discuss the proposed item lists and sequence with supplier readiness, storage and freight. Record accepted batches and costs in the order.