    FOR BUILDERS & CONTRACTORS

    Sourcing for
    Builders & Contractors

    Connect purchasing decisions to the site information that makes them usable. Cabinet sourcing for contractors is part of Foshan Bridge’s furniture and building-material sourcing and supply work. Start with the bill of quantities, current drawings and project stages so dimensions, product requirements and delivery priorities can be reviewed together.

    Illustrative cabinetry fit-out scene with an open service interface, drawing and measuring tools
    AI illustration · site coordination

    BOQ to site.
    Connect the details.

    01

    A CLEAR SOURCING PACKAGE

    Turn the BOQ into a sourcing brief

    A bill of quantities, or BOQ, is a starting point for scope and quantities. Add the specification and drawing references needed to understand each line. Identify the products included in this enquiry and the related work handled by other parties.

    BOQ fieldInformation to include
    Item code and locationBuilding, floor, room or work area
    Quantity and unitShow how the quantity has been measured or counted
    SpecificationProduct type, dimensions, materials and required configuration
    Drawing referenceCurrent drawing number and revision
    Site interfaceOpening, service point, fixing or adjacent finish to confirm
    Approval statusReady to quote, awaiting information or ready for release
    Proposed batchPriority or site stage to discuss

    Keep missing information visible in the working schedule. A quantity alone does not confirm the configuration, and a reference photograph does not replace the drawing or performance requirement for a fitted product.

    CSV
    Download BOQ preparation fields Blank planning template · fill in your own project details
    02

    SITE INFORMATION

    Resolve dimensions and interfaces before release

    For cabinetry, review finished wall and floor dimensions, openings and appliance or service interfaces relevant to the design. For doors and windows, identify the opening information, handing, installation interface and project requirements that the selected supplier must review.

    Name the person responsible for site measurement and the authority approving the final dimensions. If the site changes after a drawing is reviewed, identify the affected items and obtain a revised review before treating the earlier approval as current.

    The kitchen cabinet collection can help establish the product direction for a kitchen package. The BOQ, approved drawings and quotation must then identify the actual configuration for that project.

    SITE INTERFACE REVIEWIllustrative · not to scale
    Cabinetry interfaces to confirmAn abstract cabinet elevation with numbered markers for the finished opening, floor level, service connection and adjacent finish. No project dimensions are shown.1234
    Review the actual site information and selected configuration before release.
    1. 01
      Finished openingWall dimensions and clearances
    2. 02
      Floor levelFinished floor and cabinet base
    3. 03
      Service pointsLocations relevant to the design
    4. 04
      Adjacent finishesEdges, junctions and fixing conditions
    03

    A CONTROLLED RELEASE

    Link quotation and approval to the same revision

    White wardrobe assembly with open doors in a supplier workspace
    Supplier assembly reference · illustrative configuration

    Compare products against one stated requirement. Check quantities, included fittings, assembly condition, packing and the agreed services alongside the goods price. Record proposed substitutions and their effect on the specification before approval.

    A drawing approval should identify the revision being accepted. A price approval should identify the item and scope being bought. Keep open questions and excluded work separate, then connect the accepted documents to the order release.

    Drawing work and paid samples follow the agreed project scope. Sample or prototype fees can be credited towards a subsequent order under the agreed conditions. Any project-specific test reports or compliance documents need to match the selected product and required use.

    04

    SITE-READY PRIORITIES

    Discuss batches around site readiness

    1. 01

      Identify the stage

      Link each priority to a building, floor or work area.

    2. 02

      Check readiness

      Review supplier timing, site storage, access and handling.

    3. 03

      Agree the batch

      Confirm item lists, shipping arrangements and the effect on costs.

    Mark which products are needed for each building, floor or work stage. Distinguish the preferred arrival period from the date the goods must leave the supplier, and identify site constraints such as storage space or access for larger items.

    Phased supply requires an agreed item list, supplier acceptance and a workable shipping arrangement. Confirm the effects of storage, extra handling and separate freight before committing to batches. A requested site date is a planning input until the relevant production and transport arrangements are agreed.

    Where the quotation uses our 30–40-day production period, it starts after drawings, materials and payment are confirmed. International transit is separate. The complete project programme also needs the relevant approvals, transport and site activities to be scheduled.

    05

    IDENTIFY EVERY PACKAGE

    Specify packing marks and handover information

    INFORMATION FLOW · ILLUSTRATIVE

    1. Room / location

      Use the same room or work-area reference in the item schedule.

    2. Item / package

      Agree the item reference, batch and package identification needed.

    3. List / receipt

      Connect the packing list to the receiving check and any discrepancy.

    Discuss the identification needed by the receiving team: item reference, location or batch, package count and the relevant packing-list reference. Agree the available assembly and installation information with the selected products. The required format and detail should be part of the order scope.

    Cabinetry and furniture can use cartons with pallets or wooden cases as appropriate to the product, without an additional packaging charge under the agreed packaging arrangement. Confirm the chosen format in the order; a specific packing construction or test result must not be assumed from that general arrangement.

    Loading-related photographs can be provided. Any inspection report is agreed with the customer, and customer-specified third-party inspection is paid. Inspection scope and acceptance requirements should be resolved for the actual order.

    06

    NAME THE RESPONSIBILITIES

    Allocate transport and installation responsibilities

    Scroll across to compare all columns

    ActivityRecord before relying on it
    Transport / delivery pointAgreed trade terms and named destination
    Clearance / unloading / local movementResponsible party and the documents needed
    InstallationLocation, work scope, site conditions and agreed fee
    Receipt discrepancyItem / package references, photographs and order terms

    Record the trade terms and named delivery point in the quotation. Identify who handles destination clearance, unloading, local movement and installation, and which documents the receiving party needs. These activities have different responsibilities and should be agreed explicitly.

    Paid installation personnel can be arranged for an agreed location and scope. Confirm the installation work, site conditions and fee before relying on that service in the site programme.

    If an issue is found on receipt, keep the item and package references with photographs and the reported discrepancy. Use the agreed after-sales contact and order terms to determine the next action and responsibility for the remedy.

    07

    BEFORE QUOTATION

    Questions before quotation

    Can you work from an early BOQ?

    Yes. Identify the missing specifications and the items that can already be reviewed. Final pricing and order release require the agreed product details and approvals.

    Can an order be split across different site stages?

    It can be discussed against supplier readiness, storage, packing and freight. Confirm the agreed batches and costs in the order; a BOQ batch column alone is not a delivery commitment.

    Who checks whether a product meets project requirements?

    Provide the required use and applicable specification with the enquiry. Relevant product evidence must be reviewed against those requirements by the responsible project parties before acceptance.

    YOUR PRIORITY PACKAGE

    Bring your priority package

    On the project contact page, describe the project location, product scope and priority stage. Add reference links to the BOQ and current drawings, and identify the site questions that need to be resolved before quotation or order release.

    Review the preparation guidance above, or contact us with the information you already have.